Book a call

Cin7 Implementation //

// Lite, Standard & Advanced

A Cin7 Implementation Built to Hold Up After Go-Live

For inventory businesses running Cin7 Core, the real test is not the go live date. It is whether your inventory, your integrations, and your books still agree with each other three months later.

Partner badges & awards

  • Cin7 Accounting Partner of the Year award 2026
  • Cin7 Accounting Partner of the Year award 2025
  • QuickBooks Online ProAdvisor Platinum badge
  • Xero Platinum Partner badge
  • A2X Certified Partner badge

01 // Why it matters

Why a Cin7 Implementation is the single most important step to operational freedom

Without a correctly implemented system, growth becomes chaotic. Our Cin7 implementation services fix the root cause — not just the symptoms — so your business can scale with confidence.

  • Inventory discrepancies lock up cash.

  • Bad data blocks growth.

  • Disconnected systems waste time.

02 // Packages

Fiskal Cin7 Implementation Services

Whether you’re just starting with Cin7 or managing complex manufacturing, we have a proven track for you.

  • 01 // Package

    Lite Implementation

    The essentials you need to focus on your business, at a lower cost but requiring more input from you.

    • Comprehensive training & documentation
    • Active go-live support
    • Data verification
    • Client to import & transform data
    • Review of Cin7 system configuration
    • No guaranteed success
    • No manufacturing implementation
    Book a call
  • 02 // Package

    Most popular

    Standard Implementation

    For businesses with a wider range of integration needs – looking for a flexible solution to grow with them.

    • Everything from Lite +
    • Simple manufacturing
    • Guaranteed success
    • Complex design & integrations
    • Customized SOPs & handbooks
    • Active go-live support
    Book a call
  • 03 // Package

    Advanced Implementation

    An all-inclusive package for businesses requiring sophisticated production control and advanced manufacturing.

    • Everything from Standard +
    • Multi-level BOMs and sub-assemblies
    • Work in Progress (WIP) inventory tracking
    • Production scheduling and resource planning
    • Batch & serial number traceability
    • Labor and overhead cost allocation
    • Manufacturing lead time management
    • Finished goods quality control
    Book a call

03 // Why Fiskal

Built for businesses frustrated by failed tools

What sets Fiskal apart is our combination of deep financial know-how with hands-on system implementation experience. Our background in FP&A and controlling ensures that fixing broken Cin7 setups translates directly into clean books, reliable reporting and cash-flow visibility.

Cin7 Implementation for Sesh Products
  • Inventory Control

    Reduce stock variances by 85%+

  • Financial Visibility

    Real time financial data, ready for decision making

  • Seamless Integrations

    Connect systems like Shopify, QBO, and ShipStation with ease

  • Dedicated Support

    Talk to a real expert within 24h

  • Custom Playbooks

    Training your team to own the system

  • Success Guarantee

    Get results or get a credit - guaranteed.

04 // How we work

  1. 01

    Customized Project Planning

    Project plan with a clear timeline & step-by-step guidance.

  2. 02

    System Configuration & Verification

    Cin7 Core is configured, including inventory management, order processing & user roles.

  3. 03

    Training & Team Enablement

    On-demand tutorials, live training sessions, detailed case study & an SOP template for your team.

  4. 04

    Key Documentation

    Go-live FAQs with troubleshooting steps & a long-term reference for ongoing Cin7 management.

  5. 05

    Data Transformation & Import

    We verify prepared data to ensure accuracy & compatibility with Cin7, providing feedback where needed.

  6. 06

    Integrations

    Connections to supported tools (e.g. QBO, Xero, Shopify) are set up, and we’ll advise on non-native systems.

  7. 07

    Go-Live & Post-Go-Live Support

    Weeks of remote support with scheduled check-in meetings.

05 // Client stories

Real businesses.
Real transformations.

See more testimonials
  • Play Pits

    How Play Pits streamlined operations on Cin7 with Fiskal

  • Darë Vegan Cheese

    Darë Vegan Cheese: from messy books to clarity

  • Davids

    Davids: from welder to global brand, Eric's story

06 // Questions

Cin7 implementation, answered

What does a Cin7 implementation partner do?

A Cin7 implementation partner configures Cin7 Core around how your business runs, verifies the data you bring in, connects your other systems, and trains your team before go-live. Fiskal is a Cin7 specialist with a finance background, so the setup is built to keep your inventory and your books in agreement. Remote support continues for weeks after go-live.

How long does a Cin7 implementation take?

It depends on the package you choose, how many integrations you need, the condition of the data you are bringing in, and how much manufacturing is involved. Every implementation starts with a project plan that sets out a clear timeline, so you know the schedule before work begins. A 15-minute expert call is the quickest way to get a scope for your own setup.

How much does a Cin7 implementation cost?

Fiskal offers tiered Cin7 implementation packages, from Lite to Advanced, and the price depends on your setup and your integrations, and on whether manufacturing is involved. Cin7's own subscription pricing is set by Cin7 and sits outside our fees. You can request a full implementation quote, or book a call and we will scope it with you.

Which Cin7 implementation package fits my business?

Lite covers training, documentation, data verification, and go-live support, and you import and transform your own data. Standard adds simple manufacturing, complex design and integrations, customized SOPs and handbooks, and guaranteed success. Advanced adds multi-level BOMs, work in progress tracking, production scheduling, and batch and serial number traceability for sophisticated manufacturing.

Can you fix a Cin7 setup that went live but is not working?

Yes. Fiskal fixes broken Cin7 setups as well as building new ones, and the free Cin7 Core system review is where that starts. We look for where your inventory, integrations, and accounting stop agreeing, then plan the repair around the root cause.

Does a Cin7 implementation include accounting and Shopify integrations?

Connections to supported tools such as QuickBooks Online, Xero, Shopify, and ShipStation are set up as part of the implementation. For systems without a native connection, we advise on the options. Complex design and integrations are part of the Standard package.

Can Cin7 be implemented for a manufacturing business?

Yes. Standard includes simple manufacturing, and Advanced adds multi-level BOMs, sub-assemblies, work in progress tracking, production scheduling, labor and overhead cost allocation, and finished goods quality control. Lite does not include manufacturing implementation.

What training and support do we get at go-live?

Your team gets on-demand tutorials, live training sessions, an SOP template, and a detailed case study, plus go-live FAQs with troubleshooting steps that serve as a long-term reference. After go-live, remote support runs for weeks with scheduled check-in meetings. The aim is a team that can own the system.

No sales pressure //

Ready to build a system you can trust

We'll review your systems, uncover gaps, and build a roadmap - with no sales pressure.